Full Automation and Power Supply Provisioning for the "Healthy Water" Project

წყალი მარგებელი
CATEGORY
Industrial
STATUS
Completed

About the Project

A new chapter in the history of "Nabeghlavi" mineral water began in 1997 when Healthy Water took over production. The company did not limit itself strictly to Nabeghlavi mineral water production and, in 2002, expanded its operations to bottle "Bakhmaro" spring water.

The Challenge

Given the large scale of the production facility, the main engineering challenge was delivering a high-capacity power supply, providing robust protection against voltage fluctuations, and integrating geographically dispersed water wells into a single automated network to prevent any disruption in raw material supply.

The Result

Grounded in these engineering solutions, a highly reliable, technologically controlled, and power-protected system was established on site, ensuring the continuous and stable operation of the entire production line.

Scope of work

  • Installation of Transformer Substation
  • Cable Laying and Mounting of Cable Support Systems
  • Assembly and Installation of Power Distribution Boards
  • Installation of Diesel Generator and Uninterruptible Power Supply (UPS)
  • Data Network Installation
  • Programming and Installation of Water Well Automation Systems