The investment firm "Georgia Capital" holds 100% of the shares in m². The company occupies a prominent position in the country's real estate market, driven by the exceptional professionalism of its team. m² at Kazbegi is conveniently located just 100 meters from the State Medical University Metro Station.
The Challenge
The specific nature of the project required creating an infrastructure that would unify the primary power grid, high-speed data transmission, and fire protection within a single environment to guarantee maximum comfort and security for residents.
The Result
As a result of a comprehensive engineering approach, the residential complex secured an energy-secure, highly functional infrastructure built to European standards, ensuring the building's safe and stable long-term operation.
Scope of work
- Transformer Substation Installation
- Cabling and Cable Structure Installation
- Grounding/Earthing System Installation
- Assembly and Installation of Distribution Boards
- Lighting System Installation
- Fire Alarm System Installation
- Data Network Installation