Skip to content
INSTA - Electrical Solutions

COMMERCIAL

TEGETA SOLAR PANELS

Solar Energy Systems for 8 Tegeta Group Locations: Energy Efficiency and Reduced Costs

poti
CATEGORY
Commercial
STATUS
Completed

About the Project

The main objective across 8 different Tegeta Group locations was to reduce operational costs and high electricity consumption, improve the energy efficiency of the facilities, and transition to green, sustainable energy.

The Challenge

It was necessary to integrate an alternative energy system that would reduce dependence on the external grid and ensure a stable and cost-effective power supply for the facilities.

The Result

Through this initiative, Tegeta activated alternative energy sources across all seven branches, significantly reducing the load on the external grid and the operational budget.

Scope of work

  • Solar energy systems

HAVE A SIMILAR PROJECT?

Send us a message and INSTA's engineering team will propose a solution tailored to your facility.

GET IN TOUCH