MOMA

Project
Brief.

Background

The museum of modern art in Tbilisi (MOMA) is showcasing works of renowned Georgian artist Zurab Tsereteli and other contemporary exhibits.

An existing building was renovated and extended. We have been asked to help modernize the space and create a presentable and safe environment for future exhibits.

Scope

  • Assembling and installation of main power distribution boards and all other distribution boards
  • Installation of Fire Alarm System.
  • All type of Electrical installations.
  • Supply and Installation of Emergency Power Source – Diesel Generator.
  • Implementation of BMS system
  • Specific Lighting Design; Supply and installation of luminaries.
  • Supply and Installation of UPS.
MOMA (10)

Project Gallery