Project
Brief.
Background
“Nabeghlavi” production was taken over by JSC “Healthy Water” from 1997. Soon it became well-known throughout Georgia, gained an appreciation of the Georgian consumers and gradually the leading position on the market.
Scope:
- Installation of transformer substation;
- Cabling and installation of cable trunking system;
- Installation of generator and UPS;
- Assembling and installation of distribution boards;
- Installation of Data Networks;
- Design, installation, and programming of the Borewell automation;